Installation of a Beolec Voltage Optimisation system comprises four easy steps

  1. Our data analytics team review the electrical data, to determine the correct Beolec system for each site
  2. Our engineering and installation teams conduct a site visit to ensure that our systems are compatible with the machinery on site, and to ensure that there is an appropriate space for our system to be installed
  3. The system is installed on site by our national installations team
  4. The system is activated and saving electricity, money and greenhouse gas emissions all day, everyday for your site.

Installation typically takes 4 weeks from the time that Beovista receives a signed Licence agreement.