Installation of a Beolec Voltage Optimisation system comprises four easy steps
- Our data analytics team review the electrical data, to determine the correct Beolec system for each site
- Our engineering and installation teams conduct a site visit to ensure that our systems are compatible with the machinery on site, and to ensure that there is an appropriate space for our system to be installed
- The system is installed on site by our national installations team
- The system is activated and saving electricity, money and greenhouse gas emissions all day, everyday for your site.
Installation typically takes 4 weeks from the time that Beovista receives a signed Licence agreement.